Gold Member Since 2016
Audited Supplier
Zhongshan Xinchuang Thermal Insulation Material Co., Ltd.

Vapor Barrier, PE Film, Roofing Membrane manufacturer / supplier in China, offering Vapor Barrier Moisture Barrier PE Film, Waterproof Breathable PE Film Roofing Membrane for Steel Struction Building, Pocket Filter Media Glass Microfiber Bag Filter Mat and so on.

(/ )

Supplier Homepage Product Waterproof Building Materials Vapor Barrier Moisture Barrier PE Film

Vapor Barrier Moisture Barrier PE Film

FOB Price: US $1-1.5 / Roll
Min. Order: 500 Rolls
Min. Order FOB Price
500 Rolls US $1-1.5/ Roll
Get Latest Price
Port: Zhongshan, China
Production Capacity: 10000t
Payment Terms: L/C, T/T, D/P, Paypal

Request a custom order and have something just for you!

Send Customized Request
Basic Info
  • Type: Waterproof Roll Material
  • Material: PE
  • Ceiling Tile Type: Mineral Wool Ceilings
  • Certification: ISO
  • Usage: Indoor
  • Application: Roofing, Wall
  • Transport Package: PP Bag
  • Origin: China
  • Ceiling Tile Shape: Square
  • Thickness: 0.3mm
  • Function: Waterproof, Vapour Permeability, UV Resistance
  • Color: Grey
  • Name: Waterproof Breathable PE Film Roofing Membrane
  • Trademark: Xinchuangwei
  • Specification: customized
  • HS Code: 760720000
Product Description
Laminated by one layer of modified microporous PE film and two layers of reinforced non woven.
 

Vapour barriers or moisture barriers are films made from synthetic materials (usually polyethylene, also called PE films) that should limit the penetration of moisture from the subsurface into the laminate floor. They need only be installed on mineral subfloors such as stone, concrete, asphalt, because under certain climatic conditions water vapour can precipitate as condensation and cause structural damage. The vapour barrier is laid trough-like or "floating". The rows are laid next to each other with approx. 20cm overlap and affixed with masking tape.


Thickness scope: 0.05mm- 0.3mm

Width: maximum 14meters

Weightness per roll: 10-100kgs

Color: black or clear transparent natrual resin color

Material: high quality virgin polyethylene

 

Application of products

Mainly used as underla for pitched roof and enclosure protection for insulating layer of wails.
 
                  A. Roofing application                                                             B.Wall application
Vapor Barrier Moisture Barrier PE Film
          
             Detailed images 
 
Vapor Barrier Moisture Barrier PE Film
Vapor Barrier Moisture Barrier PE Film
Vapor Barrier Moisture Barrier PE Film
Vapor Barrier Moisture Barrier PE Film


 
Application procedure

Base plane treatment: Base surface should be smooth, hard, of no dust and no pollution, no loose objects, the base plane should be dry when using wet laid method, wet laid method require the base plane should be smooth, no leakage, no water.

Brush treatment agent when laying membrane, treatment agent should stir to mix well, pasting membrane after brushing uniform and dry, other process does not need base plane treatment agent.

Node details treatment: pipe parts should seal first, then paste the attached layer. Corner positions such as internal and external corner, elevation angle, expansion joint, construction joint and other parts of pasting additional layer. Horizontal and vertical width general ≥250 mm.

Pasting waterproof membrane

4.1 Make sure the membrane's pasting sequence and direction, play a line on base plane, then paste the membrane:

Unfolded paste method: cut the membrane in appropriate shape, paste it in opposite way on base plane and shuck off all membrane's isolation paper, paste membrane's one end at a predetermined position, pasting forward along the datum line, then use compression roller to roll on both sides , forward, so that make it stick firmly.

Roll paste method: shuck off all membrane's isolation paper and paste membrane at the same time, carry the membrane to predetermined position, aim at datum line, shuck off membrane's undersurface isolation paper, One end of membrane is fixed, Unfold the membrane about 500mm, then push membrane and used compression roller to roll on both sides , forward at the same time, In order to ensure that the initial bonding strength.

4.2 Lap joint treatment: it can be used lapping, abutting joint and welding according to different materials. Lap width is long side 65 mm and short side 80 mm. Using automatic crawl machine hot air welding lap width is 60 mm; Using 120 mm wide double-sided self-adhesive sealant to enhance processing when parallel butt joint, then make it become compaction with roller. Ensure sticking firmly between waterproofing materials, not only can use versa pasting method but also can use Mechanical fixed method.

4.3 Repair: it should be repaired when damaged, pasting broken place directly. Repair materials is greater than broken edges 100 mm and compaction, sealing.

Construction on protective layer: Surface protection adopt cement mortar or other lump materials, construction should be paid attention to protect the waterproof layer. The facade adopts polystyrene board or masonry protection.

4.4 Don't put the membranes on base plane which has pollution, water and ice. It is recommended to use double-sided or aluminum foil membrane on the parts of the protective layer needs to be done. It should do the waterproof layer at the end of last procedure, it can't cross construction. If you want to install equipment in the paved membrane, it should be taken to make additional layer of protection measures such as padded block.

Vapor Barrier Moisture Barrier PE Film


 
Send your message to this supplier
Avatar
Ms. Shirley Wong
Sales
*From:
To: Ms. Shirley Wong
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now